Combined cycle power plant_Flowtech
Ville de Daejon système d’approvisionnement en eau
  • Item Systeme anti Belier
  • Period 2008.06.18 ~ 2011.04.05
  • Type Waterworks/Sewerage
  • Developer Deajeon City
  • Design Dohwa Co., ltd.
  • Constructor KUKDONG
-Air Chamber: 40㎥ x 12K x 2ea
-Comp.: 15kW x 2ea
-Control Panel
top

Combined cycle power plant

Combined cycle power plant

Pressurization system l Surge protection system l Pressure maintaining system l Corrosion monitoring l Leak detection system l Surge tank l Pressure holding system l Combined cycle power plant l Fluid network analysis