BusinessSuivons les lois de la nature

Projets

home Business Projets
Combined cycle power plant_Flowtech
Ville de Taebek complexe de loisir
  • Item Systeme anti Belier
  • Period 2007.06.19 ~ 2007.09.27
  • Type Industrial/Agricultural water
  • Developer Teabeak City
  • Design Kolon Global
  • Constructor Kolon Global
-Air Chamber: 2.5㎥ x 40K
-Air Chamber: 2.0㎥ x 40K
-Comp.: 11kW x 2ea
top

Combined cycle power plant

Combined cycle power plant

Pressurization system l Surge protection system l Pressure maintaining system l Corrosion monitoring l Leak detection system l Surge tank l Pressure holding system l Combined cycle power plant l Fluid network analysis