Combined cycle power plant_Flowtech
Ville d’osan centrale electrique a’ cycle combines
  • Item Pressure Holding System
  • Period 2010.05.14 ~ 2010.12.30
  • Developer DAESUNG
  • Design Korea District Heating Technology
  • Constructor DAESUNG
ECO-trol: 65㎥ x 2ea Package
Heat Exchanger: 68.8Gcal/hr x 2ea