BusinessSuivons les lois de la nature

Projets

home Business Projets
Combined cycle power plant_Flowtech
Ville de Paju centrale electrique a’ cycle combines
  • Item Pressure Holding System
  • Period 2008.08.30 ~ 2009.01.29
  • Developer Korea District Heating Corp.
  • Design Korea District Heating Technology
  • Constructor DAEWOO
Pipeline Network: CES (retention quantity: 49,890㎥)
Heat Exchanger 705 Gcal/hr x 2ea
Eco-trol: 90㎥ x 16K x 2ea
top

Combined cycle power plant

Combined cycle power plant

Pressurization system l Surge protection system l Pressure maintaining system l Corrosion monitoring l Leak detection system l Surge tank l Pressure holding system l Combined cycle power plant l Fluid network analysis