BusinessSuivons les lois de la nature

Projets

home Business Projets
Combined cycle power plant_Flowtech
Ville d’incheon centrale electrique
  • Item Pressure Holding System
  • Period 2012.02~2012.12
  • Developer Korea Midland Power Co., Ltd.
  • Design Korea District Heating Corp.
  • Constructor KUMHO E&C
Size.L: Double type of 900Ax38km
Pressure Holding System: 100㎥ x 16k x 3ea
top

Combined cycle power plant

Combined cycle power plant

Pressurization system l Surge protection system l Pressure maintaining system l Corrosion monitoring l Leak detection system l Surge tank l Pressure holding system l Combined cycle power plant l Fluid network analysis